ADVEARSE picket WDDC Local Plan review roadshow today (13-9-2018)

 

The handout available at today’s roadshow is as follows……

WHY DOES THE WDDC LOCAL PLAN REVIEW FAIL BRIDPORT?

  1. HOUSING PROVISION

The West Dorset District Council Local Plan Review (LPR) proposes to build an increased number of houses in West Dorset, from 15,880 to 19,016, which, it states, is an oversupply ‘significantly above’ the ‘objectively assessed need’.

Why do WDDC plan to build more houses than are needed?

The Local Plan Review plans to increase the Vearse Farm development from 760 to 930 houses (including over 4 hectares of business parks and other buildings). The expanded Vearse Farm development comes on top of a number of significant existing and planned developments?

Why is Bridport being overloaded with these developments?

The Local Plan Review admits that ‘the total projected need for affordable housing is not expected to be met in the plan review period. The need for affordable housing is far more important than providing yet more open market houses that many local people cannot afford.

Why is that over a 20 year period WDDC cannot deliver the affordable housing needs which it says is the greatest housing priority?

  1. BUILDING ON AREA OF OUTSTANDING NATURAL BEAUTY (AONB)

The Local Plan repeatedly says that one of its key objectives is to protect and enhance the AONB.

The Vearse Farm development (just outside Bridport, in the parish of Symondsbury) is a designated area of outstanding natural beauty (AONB).

This is largest development on AONB in the UK ever proposed!

How can building nearly a thousand houses and many hectares of associated buildings be considered to be “enhancing” or “protecting” the AONB?

The VF development also contravenes the National Planning Policy Framework (NPPF) as the outline planning permission does not state the ‘exceptional circumstances’ needed to support building on an AONB. The planning permission also fails (as required by law) to consider the scope for developing elsewhere outside the AONB or meeting the housing need some other way.

  1. NOT USING BROWNFIELD SITES

The Local Plan Review fails to make any provision for the investigation of the many alternative brownfield sites available in the area covered by the plan.  WDDC are required to keep a register of brownfield sites but make no use of it for the Local Plan when considering alternatives to large developments on AONB (eg  Vearse Farm).

Why does the Local Plan Review not consider available Brownfield sites – many of which are dotted around Bridport and in some cases the land is already owned by the Council?

Also alternative models of housing provision have not been investigated, such as eco housing (eg the proposed Watton eco Village (near Bradpole) providing over 250 affordable/shared ownership homes and only 44 open market houses).

Why is the Local Plan Review not truly strategic by including such models for genuinely low-cost housing for sale and rent and making much-needed social houses a priority in order to deal with the housing crisis being suffered by local people?

  1. TRAFFIC OVERLOAD

Bridport has very poor links to the rest of the world, both in terms of roads and also public transport. The roads and narrow footways barely cope with the needs of the existing population. The highway network in the town and its approaches suffers serious congestion much of the time.  Car parking is limited and often at full capacity. Maximising safe sustainable modes of transport, walking and cycling, is not a practical option.

Where in the Local Plan review are there proposals for substantial investment in Bridport’s road network and car parking facilities and ensuring that house building is in line with the character and capacity of the town?

WE HOPE YOU SHARE OUR CONCERNS ABOUT THE LIMITATIONS IN THE LOCAL PLAN REVIEW AND THE DETRIMENTAL IMPACT OF THE LARGE SCALE VEARSE FARM DEVELOPMENT ON BRIDPORT.

IT IS VITAL THAT THE PEOPLE OF BRIDPORT HAVE THEIR SAY BEFORE IT IS TOO LATE. PLEASE TAKE THE OPPORTUNITY TO RAISE YOUR CONCERNS AT THE ROAD SHOW OR ONLINE (LINK PROVIDED BELOW).

 

ADVEARSE TEAM

Advearse contact details:

advearse@aol.com

See and respond to Local Plan Review online:

https://www.dorsetforyou.gov.uk/planning-buildings-land/planning-policy/west-dorset-and-weymouth-portland/local-plan-review/local-plan-review-west-dorset-weymouth-portland.aspx

 

‘Groundbreaking’ affordable housing project in Bridport

On Thursday, August 2nd 2018, Bradpole Parish Council hosted a presentation outlining a dynamic new development in Bridport at the foot of Watton Hill.

A groundbreaking development, it offers a brand-new way of building homes for the future that are high quality and sustainably designed, bringing the people of Bridport and its surrounding parishes outstanding living at affordable rents.

Roy Mathisen and Vince Adams, campaigning for affordable homesA small team has spent a year working with a local landowner on a proposal to build 215 affordable rented homes, 44 shared ownership homes and 24 homes for sale. The team, which includes Roy Mathisen, a Bridport based campaigner for affordable housing and fellow campaigner Vince Adams, who also promotes the development of eco homes, believes this mix of homes will create a SMART model village.

Explaining the motivation behind the project, Roy Mathisen said: ‘The level of housing poverty in Bridport and the rest of the UK is totally unacceptable. There are over 400 households in Bridport that are either inadequately housed or even homeless. We have worked very hard to develop a model that can fix this problem using private finance, whilst also giving landowners an attractive opportunity to leave an affordable housing legacy for their community without selling the land.’

Watton Hill BridportThe homes will be made of modular sections using straw-filled panel technology to give high levels of insulation and durability. Every home will have its own integrated solar roof and individual battery storage system.

This will dramatically reduce the cost of heating and will even offer surplus energy for local use.

Water reclamation, energy saving and many other innovations are at the heart of the new Village, as is the natural world. Only a small part of the lower slopes will be built on, opening up new pathways, cycle-ways, green spaces and of course woodlands that will be regenerated and managed long-term. The RSPB have offered their help in making the area a haven for birds and wildlife.

Community is another theme foremost in the scheme. Food growing areas will abound with a community centre housing an event space, laundry and small meeting rooms, creating a focus for community activities and neighbourly get-togethers.

Vince Adams pointed to the many benefits presented at the Bradpole meeting: ‘We want to add life and community to Watton Hill, whilst retaining its unique landscape. I was heartened by the way that the people of Bradpole understood and generally agreed with our project to create a new village with affordable and eco at its heart.’

Renewable energy specialist, Keith Wheaton-Green, also part of the team, gave some detail about how energy will be harnnessed and put to best use. ‘The Watton Village Smart-Communities Project is – as far as we know – the first housing development that will generate considerably more electricity than it uses. It’s a solar farm on roof tops, which is probably where most new solar farms should be from now on. There will be battery storage and electric car charging to time shift the solar generation. The dwellings will be so well insulated, and with minimal heat loss due to the mechanical heat recovery ventilation, that the latest generation air source heat pumps will provide all the hot water and space heat required. The site will have no gas connection and heat recovery from shower waste, energy efficient electrical devices and led lighting will mean very low energy bills for the occupants. All new housing developments should be like this.’

The scheme is ambitious and, at no cost to either the local or regional councils, it will offer homes to local working people, young and old, and so important to the life of Bridport.

Above all it wants to be an essential part of Bridport, open to everyone as green open space – a place to walk, picnic and reflect.

SMART means Sustainable, Modular, Affordable, Regenerative, Together – creating a new, cohesive local community alongside the existing town of Bridport.

Details about the project can be found at www.smart-communities.co.uk/wattonvillage

DCC U-turn on traffic objection……

As per the following announcement……..

WD/D/17/000986 – Vearse Farm, Bridport.

This is the formal response of the County Highway Authority.

Dorset County Council as Highway Authority (HA) were involved in the original consultations and the examination in public for the WDDC Local Plan that identified this site for development.

As a consultee of the Planning Process the HA has been involved in evaluating the highway submissions and requirements that form part of the Transport Assessment (TA) in respect of the County Roads and, with Highways England, considering impacts and requirements for the A35 Trunk Road.

As such there are various internal consultations with various Teams within Highways that look to establish the County’s position with regards to the Development proposals, these include the Improvements and Design Teams, Sustainable Transport, Road Safety, Road Management and the Development Liaison Teams.

TA’s are drawn up under guidance issued by the Department for Transport and the Chartered Institute of Highways & Transportation – in that regards the submission follows those guidelines and conforms to the format and principles that need to be considered and explored. Items considered are wide ranging and include various capacities of carriageways and junctions, existing conditions, pedestrian routes and desire lines, non-motorised traffic, sustainable transport, general highway arrangements and highway safety.

The submitted Transport Assessment (TA), prepared by the applicant’s highways consultants, considers the impact that a development including residential, commercial and school provisions on the highway network in the vicinity of the site and parts of the broader network. It considers the sustainability of the development, in terms of accessibility to and from the site.

It is proposed that there are two primary vehicular access to the site and these will be provided via a new priority junctions onto the B3162. Although the application as a whole is for outline planning permission, these two accesses are for approval at this stage and not reserved for subsequent consideration. The HA have had full regard to the suitability of these accesses as part of their consideration of this application.

The submitted indicative site layout plan indicates a road layout that is suitable for public adoption under Section 38 of the Highways Act 1980 and fully embrace the principles suggested by Manual for Streets, providing a safe and attractive place for all road users. Through good design and appropriate traffic calming measures, speeds of 20mph or less should be achieved across the estate layout. It also indicates that quality pedestrian and cycle permeability is achievable, linking to the Bridport’s existing network. These links are through to Magdalen Lane and upon future development to Pine View and Coronation Road. These pedestrian and cycle facilities are provided to the boundary of the current application site to allow a future connection to be made to Pine View and Coronation Road. It is accepted that the plans are currently indicative.

TRICS is the national standard for trip generation analysis and employs a system of site selection filtering that enables users to simulate site scenarios through a number of progressive stages and to calculate vehicular and multi-modal trip rates based on these selections. The submitted TA has, in the opinion of the County Highway Authority, complied with the recommendations of the TRICS Good Practice Guide 2013 and produced a robust daily trip generation for the proposed development.
The TRICS data outputs are attached to the TA and provide the empirical evidence to substantiate the trip rates used and the approach the Transport Assessment uses base survey year to produce a baseline of highway capacity against which the impact of the proposal can be considered. It then looks at scenarios – for forecast years with committed development and the development proposals within the context of forecast years.

The TA considers the impact of these new trips upon several junctions in detail – together with the surrounding highway network, new junctions and site accesses to the main development – to check whether they will still function within acceptable operational parameters, using industry standard design and modelling software. The conclusion reached within the TA is that all of the junctions assessed will operate within capacity in the forecast design year for the proposed development. The TA confirms that the local highway network has sufficient capacity to safely accommodate the additional development traffic movements. The HA concurs with this view.

The submission is supported by a Framework Travel Plan which seeks to encourage the use of more sustainable modes of transport for journeys within five years from the occupation of 50% of the development. This will be achieved by the implementation of a package of measures including the appointment of a travel coordinator, the distribution of travel information packs, the use of public transport and cycling and promoting the use of car sharing schemes.
In addition, the site is in a sustainable location with an excellent range of services within walking and cycling distance. The addition of a local centre, new leisure/walking routes and local play areas within the site also mean that existing residents on this side of town will also benefit from having new services located close by, thus saving some of their travel movements which may have been undertaken by car.

To sum up, the County Highway Authority considers that the submitted Transport Assessment is satisfactory and robust. Whilst it is accepted that the proposal will obviously increase traffic flows on the highway network the residual cumulative impact of the development cannot be thought to be “severe”, when consideration is given to paragraphs 29 to 36 of the National Planning Policy Framework (NPPF).

All of these matters have been carefully considered by the HA and, following the submission of revised and updated information, there are no reasons for objection and the following revised decision is issued.

With regards to The Equality Act the County Highway Authority’s position is as follows:-
The Equality Act 2010 (the Act) replaced previous anti-discrimination laws with a single Act with the aim of simplifying the law, removing inconsistencies and making it easier for people to understand and comply with. It also strengthened the law in important ways, to help tackle discrimination and inequality. The public sector Equality Duty (section 149 of the Act) came into force on 5 April 2011. The Equality Duty applies to public bodies and others carrying out public functions. It supports good decision-making by ensuring public bodies consider how different people will be affected by their activities, helping them to deliver policies and services which are efficient and effective; accessible to all; and which meet different people’s needs.
All parties involved in the design and construction of public infrastructure must have due regard to the Equality Act 2010 and the Equality Duty. This includes Developers and Designers.
In particular, Designers must refer to Inclusive Mobility (DfT, 2005 revision) and Guidance on the Use of Tactile Paving (DfT, 2007 revision) to ensure that their designs are inclusive.

All matters relating to the A35 Miles Cross Junction and other Trunk Road matters are under the jurisdiction and direction from Highways England.

COUNTY HIGHWAY AUTHORITY RECOMMENDATION FOR APPLICATION WD/D/17/000986.

The County Highway Authority raises NO OBJECTION, subject to the following conditions to cover the detailed and outline parts of the application and the formulation of a Section 106 Agreement to include relevant highway matters:-

Detailed Highways Conditions :

Before any development is commenced, other than the creation of this access or accommodating works on site, the first 20 metres of the eastern vehicle access to the B3162, together with the associated visibility splays must be laid out and constructed to a specification submitted to and approved in writing by the Local Planning Authority and accordance with the submitted drawings.
Reason: To ensure that a suitably surfaced and constructed access to the site is provided that prevents loose material being dragged and/or deposited onto the adjacent carriageway causing a safety hazard and that suitable visibility is provided to the County Road.

Before any dwelling is occupied the new pedestrian link from the site to Magdalen Lane, as indicated on the submitted drawings, shall be constructed to a specification submitted to and approved in writing by the Local Planning Authority.
Reason: To ensure that a suitably surfaced and constructed access to the site is provided.

Before 300 dwellings are occupied on site the first 20 metres of the western vehicle access to the B3162, together with the associated visibility splays, must be laid out and constructed to a specification submitted to and approved in writing by the Local Planning Authority and accordance with the submitted drawings.
Reason: To ensure that a suitably surfaced and constructed access to the site is provided that prevents loose material being dragged and/or deposited onto the adjacent carriageway causing a safety hazard and that suitable visibility is provided to the County Road.

Before the development hereby approved is commenced a Construction Traffic Management Plan (CTMP) must be submitted to and approved in writing by the Local Planning Authority. The CTMP must include:
• construction vehicle details (number, size, type and frequency of movement)
• a programme of construction works and anticipated deliveries
• timings of deliveries so as to avoid, where possible, peak traffic periods
• a framework for managing abnormal loads
• contractors’ arrangements (compound, storage, parking, turning, surfacing and drainage)
• wheel cleaning facilities
• vehicle cleaning facilities
• Inspection of the highways serving the site (by the developer (or his contractor) and Dorset Highways) prior to work commencing and at regular, agreed intervals during the construction phase
• a scheme of appropriate signing of vehicle route to the site
• a route plan for all contractors and suppliers to be advised on
• temporary traffic management measures where necessary
The development must be carried out strictly in accordance with the approved Construction Traffic Management Plan.
Reason: to minimise the likely impact of construction traffic on the surrounding highway network and prevent the possible deposit of loose material on the adjoining highway.

No development must commence on any phase until details of the access, geometric highway layout, turning and parking areas have been submitted to and agreed in writing by the Local Planning Authority.
Reason: To ensure the proper and appropriate development of the site

Before the development hereby approved is occupied or utilised, the submitted Travel Plan must be implemented and operational.
Reason: In order to reduce or mitigate the impacts of the development upon the local highway network and surrounding neighbourhood by reducing reliance on the private car for journeys to and from the site.

The development hereby permitted must not be occupied in any phase until a scheme showing precise details of the proposed cycle parking facilities for that phase must be submitted to the Local Planning Authority. Any such scheme requires approval to be obtained in writing from the Local Planning Authority. The approved scheme must be constructed before the development of that phase.

No development must commence on any phase until details of the access, geometric highway layout, turning and parking areas have been submitted to and agreed in writing by the Local Planning Authority.
Reason: To ensure the proper and appropriate development of the site

Outline Highway Conditions :-

No development shall commence on any phase until details of the access, geometric highway layout, turning and parking areas have been submitted to and agreed in writing by the Local Planning Authority.
Reason: To ensure the proper and appropriate development of the site

Before the development hereby approved is occupied or utilised, the submitted Travel Plan must be implemented and operational.
Reason: In order to reduce or mitigate the impacts of the development upon the local highway network and surrounding neighbourhood by reducing reliance on the private car for journeys to and from the site.

The development hereby permitted must not be occupied in any phase until a scheme showing precise details of the proposed cycle parking facilities for that phase must be submitted to the Local Planning Authority. Any such scheme requires approval to be obtained in writing from the Local Planning Authority. The approved scheme must be constructed before the development of that phase is commenced and, thereafter, must be maintained, kept free from obstruction and available for the purpose specified.
Reason: To ensure the proper construction of the parking facilities and to encourage the use of sustainable transport modes.

INFORMATIVE NOTES:
Developer-Led Infrastructure
The applicant is advised that, notwithstanding this consent, if it is intended that the highway layout be offered for public adoption under Section 38 of the Highways Act 1980, the applicant should contact Dorset County Council’s Development team. They can be reached by telephone at 01305 225401, by email at dli@dorsetcc.gov.uk, or in writing at Development team, Dorset Highways, Environment and the Economy, Dorset County Council, County Hall, Dorchester, DT1 1XJ.
Public rights-of-way
The attention of the applicant is drawn to the existence of public Rights-of-Way that crosses the site. This permission does not authorise any interference with or obstruction of the footpath. If the diversion or stopping-up of the path is desired, application should be made to appropriate authority.

SECTION 106 AGREEMENT HIGHWAY DETAILS :-
• On completion of the new vehicular eastern access the developer shall enter into an agreement to fully fund and provide traffic calming facilities on the B3162 in order to maintain highway safety. These works should be as the submitted drawings or as other details of which shall be first agreed with the LPA and HA of the same value as those works on the submitted drawings.

• On completion of the new the footway/cycle access to Magdalen Lane the developer shall enter into an agreement to provide and fully fund a traffic calming feature at that point to better assist non-motorised movements as the submitted drawing.

• On completion of 150 dwellings the developer shall enter into an agreement to provide and fully fund the minor improvement at the mini-roundabout junction of the B3162 West Allington/North Allington junction and for the upgrade and improvement of the existing Public Footpath linking Magdalen Lane to the Town Centre via the Dreadnought Trading Estate to a public Bridle path for the use of pedestrians and cyclists.

• The creation of pedestrian/cycle links to Pine View and Coronation Road together with ancillary works for these routes shall be constructed and fully funded by the developer in conjunction with the Construction Programme and Phased Development of the site.

IAN MADGWICK IEng MCIHT
Transport Development Liaison Engineer
Transport Development Management
Dorset County Council – County Hall – Colliton Park – Dorchester – Dorset – DT1 1XJ
(01305) 224265 – i.madgwick@dorsetcc.gov.uk – www.dorsetforyou.com/395972

ADVEARSE Vearse Farm dossier published……..

To view the dossier, click onto……

http://wam.westdorset-dc.gov.uk/WAM/doc/Representation%20(GEROLEMOU%20(FOR%20’ADVEARSE’)).pdf?extension=.pdf&contentType=application/pdf&id=1496508

Failing that, try…..

http://webapps.westdorset-weymouth.gov.uk/PlanningApps/Pages/Planning.aspx?App=WD%2fD%2f17%2f000986

then click on “Correspondence”

then click on “Representation (GEROLEMOU (FOR ‘ADVEARSE’))”

Bridport Town Council discuss VF planning application….

Please try to attend tomorrow night……
A special meeting of the Planning Committee is to be held in the Town Hall, Bridport on Tuesday 13 June 2017 at 7p.m. to consider the business on the following agenda.
(There will also be a similar meeting with Symondsbury Parish Council, on Tuesday 20th June, 7pm at Symondsbury primary school.)
http://www.symondsbury.org.uk/
*Please note change of venue
Yours sincerely
Town Clerk
This meeting is open to the press and public
AGENDA
PUBLIC FORUM
Prior to the remainder of the Committee’s meeting, a period of up to 30minutes, or less as the case may be, will be allowed for members of the public present, who are electors or residents in the parish of Bridport or adjoining parishes, to ask questions and make statements in respect of items on the agenda of this Planning Committee meeting. (The Public
Forum may be extended, if necessary, for up to an hour).
1. APOLOGIES
To receive apologies for absence submitted by Members.
Bob Gillis
Town Clerk
Mountfield
Bridport
DT6 3JP
Phone 01308 456722
e-mail: r.gillis@bridport-tc.gov.uk To: Members of the Planning Committee:- Cllrs:
Geoffrey Ackerman, Jeremy Brodie, Eddie Colfox,
Teresa Harrison, Sarah Horniman, Barry Irvine,
Julian Jones, Dave Rickard and Sarah Williams
(Copy for information to other Members of the
Council)
2. DECLARATIONS OF INTEREST
To receive any declarations of interest by members.
3. PLANNING APPLICATION: LAND AT VEARSE FARM – application
WD/D/17/000986
Outline application for the development of up to 760 dwellings, 60
unit care home (Use Class C2), 4 hectares of land for employment
(Use Classes B1, B2, B8), mixed use local centre (Use Classes A1,
A2, A3, A4, A5, B1, C3 and D1), primary school and associated
playing fields (Use Class D1), areas of public open space and
allotments, drainage works, the formation of new vehicular accesses
to West Road and the formation of new pedestrian and cycle links
(Outline). Link to application
This application is in Symondsbury Parish and the Town Council is
consulted as an adjoining parish.
The Committee will be asked to comment on this application and
make a recommendation to West Dorset District Council, who will
make the decision on the application.